Patent application title: METHODS AND SYSTEMS FOR DATA COLLECTION IN TANKS WITH FUTURE STATUS PREDICTION AND LOAD BALANCING
Inventors:
IPC8 Class: AG05B2302FI
USPC Class:
1 1
Class name:
Publication date: 2019-06-20
Patent application number: 20190187685
Abstract:
Methods and systems for data collection in tanks with future status
prediction and load balancing are disclosed. A system can include a data
acquisition circuit to interpret a plurality of detection values, a data
analysis circuit to analyze detection values to determine a future status
of at least one of a plurality of components of the tank, wherein the
future status includes at least one of: a future state, a future
condition, or a future stage of a process of the tank, and an analysis
response circuit to perform an action in response to the determination of
the future status, wherein the action includes rebalancing process loads
of at least some of the plurality of components.Claims:
1. A monitoring system for data collection in a tank, the system
comprising: a data acquisition circuit structured to interpret a
plurality of detection values, each of the plurality of detection values
corresponding to input received from a detection package, the detection
package comprising at least one of a plurality of input sensors, wherein
each of the plurality of input sensors is operatively coupled to at least
one of a plurality of components of the tank; a data analysis circuit
structured to analyze a subset of the plurality of detection values to
determine a future status of at least one of the plurality of components
of the tank, wherein the future status of the at least one of the
plurality of components comprises at least one of: a future state of the
at least one of the plurality of components, a future condition of the at
least one of the plurality of components, or a future stage of a process
of the tank; and an analysis response circuit structured to perform an
action in response to the determination of the future status, wherein the
action comprises rebalancing process loads of at least some of the
plurality of components.
2. The monitoring system of claim 1, wherein rebalancing process loads further comprises rebalancing the process loads between at least some of the plurality of components to achieve at least one of: extending a life of one of the plurality of components and facilitating maintenance on one of the plurality of components.
3. The monitoring system of claim 1, wherein the action further comprises facilitating maintenance on at least one of the plurality of components.
4. The monitoring system of claim 3, wherein facilitating maintenance comprises facilitating maintenance to achieve at least one of: extending a maintenance interval of one of the plurality of components; synchronizing a first maintenance interval of a first one of the plurality of components with a second maintenance interval of a second one of the plurality of components; differentiating a first maintenance interval of a first one of the plurality of components from a second maintenance interval of a second one of the plurality of components; and aligning a maintenance interval of one of the plurality of components with an external reference time.
5. The monitoring system of claim 4, wherein the external reference time includes at least one of: a planned shutdown time for the process of the tank, a time that is past an expected completion time of the process of the tank, and a scheduled maintenance time for the one of the plurality of components.
6. The monitoring system of claim 1, wherein the future status is a future state of the at least one component, and the future state of the at least one component is based on a time parameter.
7. The monitoring system of claim 1, wherein the future status is a future state of the at least one component, and the future state of the at least one component is based on a state of the process of the tank.
8. The monitoring system of claim 1, wherein the future status is a future state of the at least one component, and the future state of the at least one component is based on a predetermined predicted value.
9. A monitoring system for data collection in a tank, the system comprising: a data collector communicatively coupled to a plurality of input channels, wherein the data collector collects data from the plurality of input channels based on a selected data collection routine, wherein each input channel is connected to a monitoring point from which data is collected, wherein the collected data provides a plurality of detection values including detection values for a component of a plurality of components associated with the tank; a data storage structured to store a plurality of collector routes and collected data that corresponds to the plurality of input channels, wherein the plurality of collector routes each comprise a different data collection routine; a data acquisition and analysis circuit structured to interpret the plurality of detection values from the collected data and structured to determine a future status of the component or a process of the tank, wherein the future status of the component or the process of the tank comprises at least one of: a future state of the component, a future condition of the component, or a future stage of the process of the tank; and an analysis response circuit structured to perform an action in response to the determination of the future status, wherein the action comprises rebalancing loads of the plurality of components.
10. The monitoring system of claim 9, wherein rebalancing loads of the plurality of components further comprises rebalancing to achieve at least one of: extending a life of at least one of the plurality of components and facilitating maintenance on at least one of the plurality of components.
11. The monitoring system of claim 9, wherein the action further comprises facilitating maintenance on at least one of the plurality of components.
12. The monitoring system of claim 11, wherein facilitating maintenance comprises facilitating maintenance to achieve at least one of: extending a maintenance interval of one of the plurality of components; synchronizing a first maintenance interval of a first one of the plurality of components with a second maintenance interval of a second one of the plurality of components; differentiating a first maintenance interval of a first one of the plurality of components from a second maintenance interval of a second one of the plurality of components; and aligning a maintenance interval of one of the plurality of components with an external reference time.
13. The monitoring system of claim 12, wherein the external reference time includes at least one of: a planned shutdown time for the process of the tank, a time that is past an expected completion time of the process of the tank, and a scheduled maintenance time for one of the plurality of components.
14. The monitoring system of claim 9, wherein the future status is a future state of the component, and the future state of the component is based on a time parameter.
15. The monitoring system of claim 9, wherein the future status is a future state of the component, and the future state of the component is based on a state of the process of the tank.
16. The monitoring system of claim 9, wherein the future status is a future state of the component, and the future state of the component is based on a predetermined predicted value.
17. A computer-implemented method for data collection in a tank, the method comprising: collecting data from a plurality of input channels communicatively coupled to a data collector based on a data collection routine, wherein each input channel is connected to a monitoring point from which data is collected, wherein the collected data provides a plurality of detection values including detection values for at least one of a plurality of components or a process of the tank; analyzing the plurality of detection values from the collected data to determine a future status of at least one of the plurality of components or the process of the tank, wherein the future status of the at least one of the plurality of components or the process comprises at least one of: a future state of the at least one of the plurality of components, a future condition of the at least one of the plurality of components, or a future stage of the process of the tank; and performing an action in response to the determination of the future status, wherein the action comprises rebalancing process loads of at least some of the plurality of components of the tank.
18. The method of claim 17, wherein performing an action further comprises rebalancing the process loads between at least some of the plurality of components to achieve at least one of: extending a life of one of the plurality of components and facilitating maintenance on one of the plurality of components.
19. The method of claim 18, wherein facilitating maintenance comprises extending a maintenance interval of one of the plurality of components.
20. The method of claim 18, wherein facilitating maintenance comprises synchronizing a first maintenance interval of a first one of the plurality of components with a second maintenance interval of a second one of the plurality of components.
21. The method of claim 18, wherein facilitating maintenance comprises differentiating a first maintenance interval of a first one of the plurality of components from a second maintenance interval of a second one of the plurality of components.
22. The method of claim 18, wherein facilitating maintenance comprises aligning a maintenance interval of one of the plurality of components with an external reference time.
23. The method of claim 17, wherein the future status is a future state of the at least one component, and the future state of the at least one component is based on at least one of a time parameter, a state of the process of the tank, or a predetermined predicted value.
Description:
User Contributions:
Comment about this patent or add new information about this topic: