Waller Marine, Inc. Patent applications |
Patent application number | Title | Published |
20140290281 | Articulated tug and barge arrangement for LNG storage, transportation and regasification - Articulated tug and barge arrangements and methods for transportation, storage, and regasification of liquefied natural gas (LNG) aboard barge units and ballasting the barge units, and LNG bunker barge systems and methods for LNG bunkering, are provided. | 10-02-2014 |
20140261128 | Barge Mounted Floating Power Plant - According to an embodiment of the disclosure, a vessel includes a hull structure, a foundation, a plurality of springs, and plurality of hydraulic jacks. The hull structure is configured to float on water. The foundation is mounted on top of the hull structure and has significant mass. The foundation is configured to support a turbine structure and to absorb at least a portion of the forces or kinetic energy from the turbine structure. The plurality of springs are positioned between the hull structure and the foundation. The plurality of springs are configured to isolate the foundation from the effects of deflections in the hull structure, to absorb at least a portion of the forces or kinetic energy transferred from the turbine structure, and to transfer at least another portion of the forces or kinetic energy from the turbine structure to the hull structure. The plurality of hydraulic jacks are positioned between the hull structure and the foundation and are configured to adjust the degree of stiffness between the hull structure and the foundation, and to absorb forces or kinetic energy from the turbine structure. | 09-18-2014 |
20120324910 | Articulated Tug and Barge Arrangement for LNG Storage, Transportation and Regasification - Articulated tug and barge arrangements and methods for transportation, storage and regasification of liquefied natural gas (LNG) aboard barge units and for ballasting the barge units are provided. A barge unit includes a type C tank for the containment of LNG under pressure and a regasification unit fluidly coupled to the type C tank for regasification of LNG aboard the barge unit for offloading natural gas. The barge unit is adapted for loading LNG directly from a liquefaction plant, for transporting LNG by operatively coupling to a tug unit, as well as for storing LNG at a destined off board facility, and for fueling a floating power production facility. The arrangements and methods provide a transport terminal ring. The arrangements and methods provide for the circulation of seawater through the regasification unit and into ballast tanks for ballasting of the barge unit while offloading natural gas. | 12-27-2012 |