Patent application number | Description | Published |
20110135393 | BERM AND METHOD OF CONSTRUCTION THEREOF - A berm to increase capacity of an existing landfill comprises fill material and a covering portion. The landfill comprises a waste-receiving recess having an outer perimeter, an edge surface peripherally adjacent at least a portion of the outer perimeter, and an existing accumulation of waste within the recess. The fill material has a base, an inner sloped surface adjacent a future accumulation of waste, and an outer sloped surface opposite the inner sloped surface. The fill material comprises contaminated fill material fully encapsulated by an impermeable membrane. The covering portion comprises structural fill material and at least partially covers the fill material. At least a portion of the berm sits on at least a portion of the edge surface of the landfill, and portions of the berm are substantially parallel to corresponding portions of the outer perimeter. | 06-09-2011 |
20110135394 | BERM AND METHOD OF CONSTRUCTION THEREOF - Embodiments of the invention comprise berm to increase capacity of an existing landfill. The landfill comprises a waste-receiving recess having a surface and an outer perimeter, an edge surface peripherally adjacent at least a portion of the outer perimeter, and an existing accumulation of waste within the recess. The berm comprises a reinforced portion having opposing inner and outer surfaces and comprising fill material and a plurality of reinforcing members disposed therein, backfill material having an inner surface adjacent the inner surface of the reinforced portion, and an impermeable membrane encapsulating at least a portion of the backfill material, at least a portion of the fill material, and at least a portion of one or more of the reinforcing members. | 06-09-2011 |
20110135403 | BERM AND METHOD OF CONSTRUCTION THEREOF - A berm to increase capacity of an existing landfill comprises a reinforced portion and backfill material. The landfill comprises a waste-receiving recess having a surface and an outer perimeter, an edge surface peripherally adjacent at least a portion of the outer perimeter, and an existing accumulation of waste within the recess having a collective top surface. The reinforced portion has opposing inner and outer surfaces and comprises structural fill material and a plurality of reinforcing members disposed therein. The backfill material has an inner surface adjacent the inner surface of the reinforced portion. The backfill material comprises contaminated fill material and is at least partially encapsulated by an impermeable membrane. At least a portion of the berm sits on at least a portion of the edge surface of the landfill. Portions of the berm are substantially parallel to corresponding portions of the outer perimeter. | 06-09-2011 |
20120201606 | SYSTEM AND METHOD FOR STRENGTHENING A SLOPED STRUCTURE SUCH AS A BERM, BASIN, LEVEE, EMBANKMENT, OR THE LIKE - Embodiments of the invention comprise a system for strengthening a sloped structure such as a berm, basin, levee, or embankment. The comprises first and second opposing sides, the second side being adjacent the sloped structure; a bottom side adjoining bottom edges of the first and second sides, thereby forming a cavity within the first, second, and bottom sides; fill material disposed within the cavity; an impermeable membrane encapsulating at least a portion of the fill material; and a plurality of reinforcing members disposed within the fill material. | 08-09-2012 |
20120237299 | BERM AND METHOD OF CONSTRUCTION THEREOF - A system for reinforcing and facing a wall comprises a plurality of facing baskets and corresponding substantially horizontal reinforcing members, arranged in a plurality of layers. An impermeable membrane is positioned to uninterruptedly span two or more layers. At each of one or more layers, different portions of the impermeable membrane are positioned (a) between the substantially horizontal portion of the facing basket and the bottom surface of the corresponding reinforcing member, (b) around the outer end of the corresponding reinforcing member, (c) along the top surface of the substantially horizontal portion of the facing basket, and (d) angled upward toward an adjacent layer. | 09-20-2012 |
20130129420 | BERM AND METHOD OF CONSTRUCTION THEREOF - A berm to increase capacity of an existing landfill comprises a reinforced portion and backfill material. The landfill comprises a waste-receiving recess having a surface and an outer perimeter, an edge surface peripherally adjacent at least a portion of the outer perimeter, and an existing accumulation of waste within the recess having a collective top surface. The reinforced portion has opposing inner and outer surfaces and comprises structural fill material and a plurality of reinforcing members disposed therein. The backfill material has an inner surface adjacent the inner surface of the reinforced portion. The backfill material comprises contaminated fill material and is at least partially encapsulated by an impermeable membrane. At least a portion of the berm sits on at least a portion of the edge surface of the landfill. Portions of the berm are substantially parallel to corresponding portions of the outer perimeter. | 05-23-2013 |
20140234028 | BERM AND METHOD OF CONSTRUCTION THEREOF - A berm to increase capacity of an existing landfill comprises a reinforced portion and backfill material. The landfill comprises a waste-receiving recess having a surface and an outer perimeter, an edge surface peripherally adjacent at least a portion of the outer perimeter, and an existing accumulation of waste within the recess having a collective top surface. The reinforced portion has opposing inner and outer surfaces and comprises structural fill material and a plurality of reinforcing members disposed therein. The backfill material has an inner surface adjacent the inner surface of the reinforced portion. The inner surface of the reinforced portion and the adjacent inner surface of the backfill material are substantially non-planar. The backfill material is at least partially encapsulated by an impermeable membrane. At least a portion of the berm sits on at least a portion of the edge surface of the landfill. | 08-21-2014 |
20140294510 | BERM AND METHOD OF CONSTRUCTION THEREOF - A berm comprises a reinforced portion, backfill material, a drainage system, and a drainage layer. The reinforced portion has opposing inner and outer surfaces and comprises structural fill material and a plurality of reinforcing members disposed therein. The backfill material has an inner surface adjacent the inner surface of the reinforced portion. The backfill material is at least partially encapsulated by an impermeable membrane. The backfill material comprises contaminated fill material. The drainage system is within the impermeable membrane. The drainage layer is adjacent an inner surface of the impermeable membrane and contacting the drainage system. | 10-02-2014 |
20140356071 | BERM AND METHOD OF CONSTRUCTION THEREOF - A system for reinforcing and facing a wall comprises a plurality of facing baskets and corresponding substantially horizontal reinforcing members, arranged in a plurality of layers. An impermeable membrane is positioned to uninterruptedly span two or more layers. At each of one or more layers, a portion of the impermeable membrane is positioned around the outer end of the corresponding reinforcing member. | 12-04-2014 |
20140363235 | SYSTEM AND METHOD FOR STRENGTHENING A SLOPED STRUCTURE - A system for strengthening a sloped structure comprises first and second opposing sides, a bottom side, fill material, a plurality of facing baskets adjacent the first side, a plurality of reinforcing members disposed within the fill material, and an impermeable membrane. The second side is adapted to be adjacent the sloped structure. The bottom side adjoins bottom edges of the first and second sides, thereby forming a cavity within the first, second, and bottom sides. The fill material is disposed within the cavity. The impermeable membrane encapsulates at least a portion of the fill material and one or more of the reinforcing members. The facing baskets and the reinforcing members are positioned in a plurality of layers, with each layer comprising one facing basket and one corresponding reinforcing member. The impermeable membrane is positioned to span two or more layers of the plurality of layers. | 12-11-2014 |
20150037100 | BERM AND METHOD OF CONSTRUCTION THEREOF - A berm comprises fill material, a covering portion, and a drainage system. The fill material comprises contaminated fill material fully encapsulated by an impermeable membrane. The covering portion comprises structural fill material and at least partially covers the fill material. The drainage system is within the impermeable membrane. | 02-05-2015 |